Spaces

Visit and start-date confirmations for finishing contractors

These confirmation messages repeat the day, time, address and what the customer needs to prepare for a measure visit or a start date. They are made for painters, floor layers, tilers and drywallers.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

A confirmed visit that nobody remembers is a wasted trip. Finishing trades depend on the customer being ready: furniture moved, access arranged, pets put away. A clear confirmation takes two minutes to write and saves a lot of arriving to find a room full of boxes.

Fill in the day and what you need the customer to do, then copy the message that fits. Send it as soon as the booking is made. Keep the instruction to one thing, so it is easy to remember and easy to follow.

Measure visit confirmed

Your measure visit with [business] is booked for [when]. Our estimator will take sizes and photos and give you a clear quote. Please [prep] so the visit is quick.

Start date confirmed

Good news from [business]: your crew will arrive on [when]. Before we start, please [prep]. If anything changes on your side, tell us here and we will adjust the plan.

Final day and walk-through

[business] will finish your job on [when]. When we are done, the site lead will walk through the room with you. Please [prep] and let us know if you cannot be home.

Delivery of materials

Your materials for the job are due on [when]. Please [prep] so the delivery can be stored safely. [business] will message you once everything is on site.

What a good confirmation holds

Every confirmation should state the day, the time or arrival window, the address and one thing to prepare. The customer then has everything on one screen, and your crew is spared a phone call asking for the street number.

For longer jobs like flooring or a full repaint, add a line about how long the work should take and what mess or noise to expect. People handle disruption well when they were warned, and badly when they were surprised.

Preparation lines that work

Here are short instructions that customers actually follow.

  • Move small furniture and rugs out of the room.
  • Clear shelves and take pictures off the walls.
  • Make sure someone can let us in at the time given.
  • Tell us about pets and we will keep doors shut.

FAQ

How long before the visit should I send the confirmation?

Send it straight after booking, then a reminder the day before. A confirmation is for the plan, and the reminder is for the moment. Both are replies to a customer who expects to hear from you.

Should I include the price in a confirmation?

Only if the price was already agreed in writing. A confirmation is about time and preparation. Putting a price in it can start an argument if the number was not clear.

What if the customer wants to change the time?

Offer the next free slot from your calendar and confirm the new time in a fresh message. If the change affects other trades on a build, pass it to a person.

More free tools for painters, flooring and tile contractors

Read the guide: Reply to painting, flooring and tile enquiries with photos in hand.