Hand-over rules: when a plant chat must go to a person

This checklist lists the concrete and block chats an AI agent should pass to a person, such as mix design, strength, weather and complaints about a load. It helps owners set the rules first.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

An AI agent copes well with everyday questions: opening hours, standard mixes on your sheet, pallet sizes, delivery area. Concrete also brings moments where a wrong answer can ruin a slab or hurt someone. Those must reach a person on your team fast, with the facts written down.

Work through each rule and decide whether it applies at your plant. Then give the final list to whoever sets up your agent, and name one person per shift who can be called in. A rule with no owner will fail on the busiest morning of the week.

Tick each one as you go. 0 of 10 done.

[ ] Any question about mix design or strength for a structural element.
[ ] Pours planned in frost, heavy rain or high heat.
[ ] Questions about additives, accelerators or curing in unusual conditions.
[ ] A failed cube test, a crack, or a surface fault on a finished pour.
[ ] Any complaint about a delivered load, such as a wet mix or a late truck.
[ ] Disputes about waiting time, extra charges or a rejected load.
[ ] Any site safety concern, such as access, overhead lines or an unsafe tip point.
[ ] Account, credit and payment queries from builders and merchants.
[ ] Large or repeat orders, such as a whole development or a bulk cement contract.
[ ] Anything the agent is unsure about, or a customer asking for a person.

Make the hand-over quick for the builder

A builder should not have to explain the pour twice. A good hand-over note says who wrote, which site, how many cubes, what mix and what the problem is. Our hand-over notes tool helps you write that note.

Tell the customer what happens next in one line, for example: I have asked our dispatcher to ring you about the frost forecast within the hour.

Settle these with your team first

Agree on the answers before you switch anything on.

  • Who takes hand-overs before the first truck leaves at dawn?
  • Who decides a pour is cancelled for the weather?
  • How long may a builder wait for a person to reply?

FAQ

Why not let the agent answer strength questions?

Because the right answer depends on the structure, the mix and the conditions. Only your technical person can judge that, so the agent notes the details and passes the chat on.

What if nobody is free when a hand-over comes in?

Tell the customer honestly that the team is loading trucks and will ring as soon as they can. A short, true message is better than silence or a guess about a live pour.

Can I change these rules later?

Yes. Review them after the first few weeks. Many owners add a rule after a close call, and relax others once they see how the common questions are handled.

More free tools for concrete and cement producers

Read the guide: Handle concrete orders and delivery questions before the truck rolls.