Spaces

How many hours a week do buyer messages take your factory?

This planner estimates the hours a week your garment factory spends answering buyer messages. Enter how many arrive, how long each takes and how many days you reply.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Buyer messages in a sewing factory rarely look like a job. A photo of a jacket, a question about a minimum, a size sheet to check, a sample to chase. Each one takes a few minutes, but they arrive all day and pull planners and sales people away from the floor and the phone.

Enter your own figures, or begin with the examples. Count a typical day, not your quietest. The result shows hours a week, hours a month and working days a month. It is a useful number to hold before you decide who answers chats and when.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering15
Hours a month (4.3 weeks)65
Working days a month (8-hour days)8.1

This is an estimate based on the figures you enter, so use your real numbers for the best picture.

Reading your result

Many owners are surprised by the answer. Messages are scattered across short gaps, and the time is borrowed from planners, cutters and supervisors who do not count it. Seen as a single number, it often equals several working days a month.

Then look at where it goes. Which questions are repeated? Which need a planner? A good share are usually the same questions about minimums, samples and lead times, which can be answered from a written note.

  • Count messages for a full week for a better average.
  • Include photos and files that need a closer look.
  • Note how many questions are repeats.

What to do with the number

A high figure is a reason to look at your routine, not to worry. Written answers cut minutes from each reply, and an AI agent can take the simple questions while your planners keep the complex ones.

FAQ

How do we count messages if we do not track them?

Pick one normal week and tally them on a sheet near the planning board. Even a rough count gives a more honest number than a guess from memory.

Should we include emails and calls?

You can run the planner separately for each and add them up. This tool is built for chat messages, so begin there and see how large the number is.

Why does the result matter if the team copes?

Coping often means the time is hidden in short breaks and extra effort. Seeing the real figure helps you decide whether that time is best spent this way.

More free tools for garment factories and sewing contractors

Read the guide: Answer garment factory and contractor messages while the line keeps moving.