Spaces

Price and quote replies for connections and electricity services

These replies help electricity businesses answer price questions about connections, upgrades and meter work without guessing. They explain how a quote works and who will provide it.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

How much will it cost to connect? is the question that starts most installer and developer chats. The honest answer depends on the site, the capacity and the distance to your network. A guess in chat can become a promise that your engineers have to explain away.

Fill in who prepares quotes and how long they take. Then copy the reply that fits the question. These messages do not give a price, and that is deliberate. They explain why, set expectations and tell people what to send so the quote is quick and correct.

New connection price

Thank you for asking [business]. The cost of a connection depends on your site, the load and the distance to our network, so I cannot give a figure in chat. [quote team] will prepare a quote in [quote time].

Upgrade or capacity question

Hello from [business]. Whether we can add capacity depends on a technical check of the local network. Please send your address and what you plan to add, and [quote team] will reply in [quote time].

Meter or service work

Hi, this is [business]. Fees for meter and service work are listed on our published schedule. If your case is unusual, [quote team] can confirm the cost and will reply in [quote time].

Developer or installer asking for a rough number

Hello and thanks. We do not give rough figures in chat, because a wrong number can cost your project time. [quote team] at [business] can give a formal quote, which usually takes [quote time].

Help people get a quote faster

Most delays come from missing information. Ask for the address, the planned load, the type of supply and any drawings in the first reply. A complete first message can save a week of back and forth.

If you publish a fee schedule for standard jobs, the agent can point to it. Keep the schedule current, since an old one causes disputes later.

  • Ask for address, load and supply type in one message.
  • Link to published fees for standard work only.
  • Tell the person when a quote is a formal document.

What the agent should not do

Money and commitments need a person.

  • Give a rough figure or range.
  • Promise that a connection is possible.
  • Compare your fees with other providers.

FAQ

Why can the agent not give even a rough price?

Connection costs depend on the site and the local network, so a rough number is often wrong. A wrong number can cause a dispute, so a quote from your team is safer and fairer.

Can the agent point to published fees?

Yes, for standard jobs where you publish a schedule. Give it the exact page and keep it up to date, so customers do not see old prices in a chat.

How do I speed up quotes?

Collect the address, planned load and supply type at the start. Ask for drawings or photos if useful. A complete request is much faster for your engineers to price.

More free tools for electricity generators and power distributors

Read the guide: Answer customer and contractor messages at an electricity business.