Spaces

Job, visit and room set-up confirmations for facilities teams

These templates confirm a logged fault, a booked contractor visit, a room set-up or a delivery slot, with the details the sender needs. They are written for facilities and building services teams.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

A confirmation turns a vague promise into something both sides can check. For a facilities team, that means a ticket reference, the place, the target time and a name. When a tenant has this in writing, they stop chasing, and when a contractor has it, they arrive at the right gate.

Enter the ticket or booking reference and the place in the boxes. Choose the message that matches what you are confirming and send it straight after the job is logged. Read it once to check the times against your own rota before sending.

Fault logged

Thanks, your report is logged with [business] as [ref]. It covers [place]. Our normal target for this kind of fault is [when]. Message us here with the reference if anything changes.

Contractor visit booked

Your visit with [business] is booked, reference [ref]. Please come to [place] [when] and sign in at reception with your company name and the reference. Bring your induction card if you have one.

Room or event set-up

Your set-up request is confirmed by [business], reference [ref]. We will prepare [place] for [when]. If numbers or layout change, tell us here and we will update the job.

Delivery slot

Your delivery slot at [business] is confirmed, reference [ref]. Please use the loading bay at [place], [when]. Drivers must report to the desk before unloading, and the team will meet you there.

What every confirmation should carry

Four things make a confirmation useful: a reference, a place, a time and a way to change it. Leave one out and the message starts a second round of questions. If you only have a target and not a booked time, say so plainly.

Do not confirm anything the agent cannot see in your work-order system or rota. If it is only collecting the details, the message should say that a person will confirm the time.

Common slips

These cause the most confusion after a confirmation goes out.

  • Sending the message before the job is really logged.
  • Giving a floor but not the name of the building.
  • Leaving out the sign-in or permit step for contractors.

FAQ

Should every fault get a written confirmation?

Yes, even small ones. A reference number takes seconds to send and saves several follow-up messages. It also gives your own team something to search for in the system.

What if the time changes after I confirm?

Send a short update with the new time and the reason as soon as you know. Use the delay notices tool for wording. People forgive changes far more easily than silence.

Can I confirm the engineer's name?

Only if your rota is firm. Names change when someone is sick or diverted. It is safer to name the company or team, and share a person's name on the day.

More free tools for facilities support teams

Read the guide: Answer site and tenant requests for facilities teams around the clock.