Spaces

Hand-over notes for estimators and crew leaders

These hand-over notes give an estimator, site manager or owner everything they need from a chat in a few lines: address, photos, urgency and what the customer wants. They suit roofing, concrete, masonry, glazing and framing businesses.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

When an agent passes a chat to a person, the worst result is a call that begins with: so, what is the problem? The customer has already explained once and does not want to again. A good hand-over note puts the facts at the top so the person can pick up the thread as if they had been there.

Fill in who the note is for and the urgency level you use. The notes below show the shape: who, where, what, photos, urgency and what the customer was told. Give your agent a version in your own words, and keep them short enough to read on a phone between jobs.

Active leak

For [to]: [urgency]. Customer reports water entering the building. Address, photos and phone number are in the chat. I told them to protect belongings and that a person would call. They have not been given a price or a time.

Estimate request

For [to]: [urgency]. New enquiry for a roof or exterior job. I have the address, the building age and photos. They prefer mornings. I offered two site visit slots, no price given. Please confirm a time.

Structural worry

For [to]: [urgency]. Customer asks whether a crack or sagging area is safe. I did not give an opinion. Photos and address are attached. Please call them and say whether an engineer should look.

Builder with plans

For [to]: [urgency]. Builder sent plans for framing or concrete work at a new site. Start date wanted is in the chat. I confirmed our trade and area only, nothing on price or capacity. Please review and reply.

Complaint

For [to]: [urgency]. Unhappy customer about a finished job. Their message and photos are in the chat. I apologised and said you would call. No fault admitted, no refund offered. Please check the job file first.

What a good note always contains

Who the customer is, where the job is, what they want and how urgent it is. Then what the agent told them, so the person does not contradict it. Last, what you need the person to do, such as call, quote or book. If a note answers those, it works.

Keep each note to a few lines. A site manager reading on a ladder will not scroll through paragraphs. Put the most urgent fact first, and use plain words rather than abbreviations only one person understands.

Make notes part of the day

To get value from the notes:

  • Agree on urgency labels the whole team understands.
  • Check handed-over chats at set times each day.
  • Reply to the customer in the same chat so the history stays together.
  • Tell the agent when a note missed something and add it to the brief.

FAQ

Should the note include the full chat?

The person can read the full chat in the same thread, so the note only needs to be a short summary. Its job is to help them decide what to do in the first ten seconds.

Who should receive hand-over notes?

Match the person to the topic: the estimator for quotes, the crew leader for scheduling, the owner for complaints, safety and anything about money or structure. One name per type keeps things moving.

Can the agent mark which chats are urgent?

Yes. Tell it what urgent means for you, such as active leaks, safety worries and open roofs, and ask it to put an urgency label at the start of every note.

More free tools for roofing, concrete and framing contractors

Read the guide: Reply to roofing, concrete and framing enquiries while you are on the job.