First-week checklist for an AI agent at a steel mill

This checklist covers the first week of an AI agent answering messages at a steel mill or ferroalloy plant, from writing down gate rules to reviewing real chats. It is for mill managers and logistics leads.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

A mill is a serious place to try something new. Trucks queue, certificates have legal weight, and a wrong bay number can block a loading line. That is why the first week should be small and watched closely. Start with the questions that repeat every day, and keep the risky ones with your people.

Work down the list in order. Early steps are about writing things down, because an agent can only repeat what you have told it. Later steps are about watching real chats and fixing what you see. Share the list with your logistics, quality and sales leads so each knows their part.

Tick each one as you go. 0 of 10 done.

[ ] Write down gate hours, weighbridge hours and loading order in plain words.
[ ] List the sections, grades and lengths you make, and those you do not.
[ ] Write how to request a certificate and which reference is needed.
[ ] Name who takes price, allocation, quality and safety chats on each shift.
[ ] Connect only the chat accounts your buyers and drivers already use.
[ ] Set the agent to answer only the topics you listed, at first.
[ ] Tell your regular buyers and haulier contacts that replies may come from an AI agent.
[ ] Read every chat at the end of days one to three.
[ ] Fix each wrong or awkward answer by adding the missing fact.
[ ] Review hand-overs on day five with the sales, quality and logistics leads.

A sensible week, in short

On day one, write and connect. On days two and three, let the agent handle only gate and document questions while you read every chat. By day four, add product range questions. On day five, sit down with the people who receive hand-overs and ask what they wish the note had said.

Do not widen the agent to new topics until at least two clean days in a row. Mills run on routine, and so should this.

Common first-week trouble

Plan for these and they will cost you little.

  • Gate hours that differ between the website and the real rule at the weighbridge.
  • Certificate rules known only by one person in the quality office.
  • A hand-over desk that is not watched at night.
  • Information in the agent that was true last month but changed at the last shutdown.

FAQ

How much does a mill need to prepare before the first week?

Less than most expect. A page of gate rules, a product list, the certificate steps and a list of who takes which hand-over is enough to begin with.

Should we start with drivers or with buyers?

Many mills start with drivers and gate questions because they are repetitive and easy to check. Add buyer document requests next, and leave price talk with your sales team.

What if the agent gives a wrong answer in week one?

Find which fact was missing or out of date, correct it, and check the next few chats. If the error touched money or safety, tell the person who owns that topic.

More free tools for steel mills and ferroalloy plants

Read the guide: Answer buyer and trader messages for your steel mill.