Spaces

Hand-over rules: when a lumber yard chat must go to a person

This checklist lists the chats a lumber or building materials agent should pass to a person: structural questions, damaged loads, credit holds and loads already on a truck. It helps owners set the rules first.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

An AI agent is good at yard hours, product sizes and delivery cut-offs. A materials yard also has moments where a wrong answer costs real money or safety, like a beam span question or a pallet of broken pavers. Those chats should reach a named person on your team quickly.

Go through each rule and mark whether it applies to your yard. Then give the final list to whoever sets up your agent and make sure someone on each shift knows they may be pulled in. A rule that nobody owns tends to fail on a stormy Friday afternoon.

Tick each one as you go. 0 of 10 done.

[ ] Any question about whether a size will carry a load or span.
[ ] Fire rating, moisture, code or inspection questions.
[ ] Damaged, short or wrong material reported after delivery.
[ ] Any change to a load already on a truck.
[ ] Credit holds, account terms and overdue balances.
[ ] Negotiated or large project pricing.
[ ] Any report of an injury or a hazard on a site or in the yard.
[ ] A contractor who says they are unhappy or threatens to move accounts.
[ ] Special orders, reclaimed stock and anything not on your price list.
[ ] A request to release material to someone who is not on the account.

Pass over with the details already gathered

A good hand-over saves the contractor from repeating themselves. Ask your agent to leave a short note with the job name, address, item list, docket number and any photos. The person who picks up can then reply in one message instead of five.

Say clearly in the chat who is taking over and roughly when. A line such as Sam on the counter will pick this up within the hour is enough to keep a crew from ringing three other yards.

Mistakes to avoid when setting the rules

Owners tend to get these wrong in the first month.

  • Writing the rules once and not reviewing them after a bad week.
  • Passing everything to a person, so the agent saves no time.
  • Naming a role instead of a person, so nobody feels responsible.
  • Leaving out weekend and early morning cover.

FAQ

Can the agent tell a contractor which beam size to use?

No. Span and load questions go to a person, ideally an engineer or your technical rep. The agent says it will pass the question on and records the job details.

What should happen when a pallet arrives damaged?

The agent stays calm, asks for the docket number and photos, and hands over to a person. It does not promise a credit or a replacement itself.

Who should take over after hours?

Pick one named person for urgent matters such as a safety report, and tell the agent to say when the yard reopens for everything else.

More free tools for lumber and building materials wholesalers

Read the guide: Answer contractors about lumber, stone and roofing before the truck leaves.