Spaces

Message workload planner for vehicle parts sales desks

This planner works out how many hours a week your team spends answering buyer messages, from the number of chats, the minutes each takes and the days you work. It is made for vehicle parts maker sales and technical desks.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Parts messages look small one at a time. A fitment check takes four minutes, a stock question two. But twenty a day across five days is more than eight hours a week, which is a whole working day lost from selling, quoting and chasing real orders.

Enter how many messages arrive on a typical day, how long each takes your team on average, and how many days a week you receive them. Use honest numbers, perhaps from last week's inbox. The planner shows hours a week, a month and in working days.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering18
Hours a month (4.3 weeks)75
Working days a month (8-hour days)9.4

This is an estimate from your own figures, and real weeks vary with seasons, launches and month-end schedules.

Reading the result

If your answer is more than ten hours a week, one person is spending a quarter of their time on chat. That is fine if the answers are high value, but many of the questions are repeats: stock, part number, lead time. Those are the ones a well-prepared agent can handle.

Look at what your team could do with the time. Quoting vehicle makers, following up late payments, visiting distributors, improving the catalogue. The workload number is not a cost to cut, but a pool of hours you could use better.

  • Count only messages that need a reply, not notifications.
  • Time a few real chats with a stopwatch before guessing the average.
  • Run the planner again for your busiest month.

Why the average hides the peaks

Most parts desks have a spike between seven and ten in the morning, when workshops plan the day. The average hours may look manageable, while the morning is overwhelmed. Look at your busiest two hours, not only the day total.

FAQ

How do I find the average minutes per message?

Time five or ten real chats from start to finish, including the lookup and the reply, then average them. Fitment checks take longer than stock questions, so mix both types.

Should I include hand-over chats?

Include the time your team spends on them, since it is real work. If you want to see only what an agent could handle, run the planner again with only the routine chats.

Why does the planner use 4.3 weeks a month?

A month has a little over four weeks. Using 4.3 gives a fair monthly figure, so a weekly number does not look smaller than it is across the whole year.

More free tools for vehicle parts makers

Read the guide: Answer part number and fitment questions for vehicle parts.