Spaces

Load slot and order confirmations for asphalt and lube plants

These confirmation messages repeat back a loading slot, mix order or delivery so the driver, crew or buyer knows exactly what was agreed. They are written for refineries, asphalt plants and lubricant blenders.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

A confirmation is your chance to catch a mistake before a truck arrives. If the grade, quantity or time is wrong, it is much cheaper to find out in a chat than at the weighbridge. A clear repeat of the order also gives the driver something to show at the gate.

Fill in the boxes with your usual slot details, then choose the message. Always repeat the product, quantity, time and account. Only send a confirmation after a person or your live board has actually held the slot, never on a guess.

Hot mix slot held

Confirmed by [business]: [product], loading [when]. Please bring [papers]. If the weather turns or your crew stands down, message here and dispatch will move the slot.

Tanker pickup booked

Your pickup with [business] is booked: [product], [when]. Drivers should bring [papers]. Please arrive within the slot, as late trucks may be moved to the next gap on the board.

Lubricant delivery order

Thanks, your order with [business] is confirmed: [product], due [when]. Please have [papers] ready at receiving. Reply here if the site hours or the delivery address change.

Change confirmed

Your change is done at [business]. The order is now [product], [when]. Please bring [papers]. If anything here looks wrong, tell me now so dispatch can fix it before you load.

Slot cancelled

Your slot with [business] for [product] on [when] is cancelled, as you asked. If you need another time, message here with the quantity and a new day and I will check the board.

What every confirmation should hold

Four things matter most: what, how much, when and what to bring. Add the site name if you run several. A foreman who reads the message back should be able to spot a wrong grade or a wrong time in a few seconds.

If your plant uses a loading number or reference, include it. Gate staff can then find the order without hunting through the board.

Avoid these confirmation slips

These are the problems that lead to wasted trips.

  • Confirming a slot the board never showed as open.
  • Leaving out the quantity, so the wrong amount is loaded.
  • Forgetting to say how late a truck may arrive.
  • Sending a confirmation for a price that has not been agreed by a person.

FAQ

Can the agent confirm slots on its own?

It can when it reads a live dispatch board and your rules are clear. If the board is out of date or a custom load is involved, a dispatcher should confirm before the message goes out.

Should the confirmation include the price?

Only if a person has agreed it and it is written in your system. Many plants leave price out of chat confirmations and keep it on the order or invoice, which avoids disputes.

What if the driver replies with a change?

The agent should treat it as a new request, check the board and ask a dispatcher where needed. Then it should send a fresh confirmation so everyone has the latest details.

More free tools for refiners, asphalt plants and lubricant blenders

Read the guide: Answer terminal, plant and distributor messages around the clock.