Spaces

Message workload planner for plywood and veneer plants

This planner works out how many hours a week your plywood, veneer or engineered wood plant spends answering buyer messages. Enter your daily messages, time per reply and working days to see the weekly and monthly total.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

In a panel plant, message time hides in small pieces. A salesperson answers a size question between calls, the shipping coordinator replies to a driver, the planner is asked about lead times. None of it feels big, but together it can take a large share of the week.

Enter a typical day below. Count the messages you get from buyers, drivers and distributors, and the average minutes each takes to answer, including looking up stock or a spec. The result shows the hours a week and a month, so you can see what it costs.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering13
Hours a month (4.3 weeks)57
Working days a month (8-hour days)7.2

This is an estimate based only on the figures you enter, so use averages from a normal week rather than your busiest one.

What the number tells you

If the total is only a few hours a week, a clear routine may be all you need. If it is a day or more, you are paying staff to type the same sizes and lead times again and again, and that time could go on quotes, claims and key accounts.

Notice also when the time falls. Replies often cluster at the start of the day and just before the truck cut-off, which are the busiest hours for the yard as well.

Getting a more honest figure

Try these for a week and compare.

  • Count messages for five working days, not one.
  • Include drivers and distributors, not only buyers.
  • Add the time spent checking stock or asking the planner.
  • Note which questions repeat most often.

FAQ

What counts as a message?

Any buyer, driver or distributor message that needs a reply from your team. Count a back-and-forth chat as one if it is a single question, and as several if it covers different orders.

Why include the time to check stock?

Because that time is part of the real cost of answering. A one-line reply that needs a walk to the yard takes far longer than it reads.

What should I do with the result?

Compare it with how much of that time is repeat questions. Those are the ones an AI agent can take, leaving your people the quotes, claims and technical talk.

More free tools for plywood, veneer and engineered wood makers

Read the guide: Answer plywood and veneer enquiries without pulling a planner off the floor.