Spaces

Message workload planner for metal fabrication shops

This calculator shows how many hours a week your fabrication shop spends answering messages, from your own figures for messages a day and minutes each. It helps owners see the real cost of the inbox.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Message time in a fabrication shop hides in small pieces. A delivery window here, a drawing request there, a quick answer from the cutting floor. None feels like much, but across a week it can add up to a surprising number of hours, often from your most expensive people: the estimator, the dispatcher and the owner.

Enter how many messages arrive on a typical day, how many minutes each one takes to read, answer and deal with, and how many days a week you reply. Be honest about the minutes, including finding the drawing or checking the schedule. The result is an estimate from your own figures.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering15
Hours a month (4.3 weeks)65
Working days a month (8-hour days)8.1

This is an estimate based on your own figures, so use a typical week rather than your busiest or quietest.

Why the number is often higher than you think

Most owners guess two minutes a message. In fabrication it is closer to five or more, because a good reply means opening a drawing, looking up the job or checking the delivery schedule. Add the time lost switching away from other work, and the true cost is higher still.

The hours also fall on the people you can least spare. When your estimator is answering delivery chats, quotes wait. When dispatch is answering drawing questions, trucks wait.

What to do with the result

Once you see the figure, you can decide what to change.

  • Find which types of message take the most time.
  • Write ready answers for the questions you repeat every day.
  • Let an AI agent handle status and first replies, with a person on hard questions.
  • Move delivery chats off the estimator and onto dispatch, or the reverse.

FAQ

What should I count as one message?

Count each separate customer message you need to deal with, including follow-ups in the same chat. A long chat about one job may be five or six messages.

How do I measure minutes per message?

Time a few real replies across a normal day, including finding the drawing and checking the schedule. Use the average, not the quickest, and round up if unsure.

Does this include phone calls?

No, only messages. If many chats turn into calls, add that time to the minutes per message so your figure reflects the real work involved.

More free tools for steel, sheet metal and window fabricators

Read the guide: Answer builder and architect messages for your metal fabrication business.