Spaces

Message workload planner for motor and switchgear makers

This planner turns your daily message count and the minutes each one takes into hours a week and days a month. It is for electrical equipment makers who want to see what chat really costs their sales and service teams.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Messages to a maker of motors, transformers and switchgear are rarely quick. A spare part query needs the model looked up. A lead time needs the planner. A fault needs an engineer. Each reply takes minutes, and those minutes add up across the day without anyone noticing.

Enter a typical day: how many messages arrive, how many minutes a reply takes on average and how many days a week you answer. Use honest figures, including the time spent looking things up. The result shows the true weekly load.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering15
Hours a month (4.3 weeks)65
Working days a month (8-hour days)8.1

This is an estimate based on your own figures, and your real week may vary with outages, shutdown seasons and project peaks.

Reading your result

Look at the hours a week first. If it is more than a day for one person, chat is a real job in your business, whether or not anyone has it in their title. That time is usually taken from engineers and sales staff who could be doing other work.

Then look at the month. Many owners are surprised to see a whole working week of time spent each month on repeat questions about datasheets and replacements.

Where the minutes hide

Check these when you count.

  • Searching shared folders for the right drawing.
  • Asking a colleague which model replaces an old one.
  • Chasing a customer for a nameplate photo.
  • Writing the same lead time answer ten times a week.

FAQ

How do I count the minutes per message?

Time ten ordinary replies from reading to sending, including any lookups, then take the average. Do not count time spent on a full quote, which is a separate job.

Should I include messages that need an engineer?

Yes, include the time of the first reply and the handover. The engineer's longer work on faults and sizing is a different matter and is better counted apart.

What if my volume changes by season?

Run the planner twice, once for a normal week and once for a peak such as outage season or a plant shutdown. The gap shows how much extra cover you need.

More free tools for motor, transformer and switchgear makers

Read the guide: Answer contractor and plant engineer messages for electrical equipment makers.