Spaces

The first-reply checklist for foundry enquiry messages

This checklist lists what a first reply to a new casting enquiry should contain, so the engineer or buyer knows what happens next. It is made for iron, steel, aluminum and die-casting shops.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

A foundry enquiry usually arrives half finished: a photo of a broken part, a drawing with no quantity, or a one-line question about whether you can pour stainless. The first reply decides whether the buyer sends the missing pieces or tries the next shop on the list. A good reply is quick, specific and asks for the right things in one go.

Go through the list below and tick what your replies already do. Where you find gaps, write the missing line into your agent instructions once, so every new enquiry gets it. Keep the reply short. The buyer wants to know you can cast the part, what you need, and who will look at it.

Tick each one as you go. 0 of 10 done.

[ ] Thank them and say which process might suit: sand, investment, gravity or die casting.
[ ] Ask for a drawing, model or sample, and say which file types you can open.
[ ] Ask for the material or grade, or the job the part does if they are not sure.
[ ] Ask for the quantity, both the first order and the likely yearly amount.
[ ] Ask whether the part needs machining, heat treatment, coating or testing.
[ ] Ask for the date they need the first parts, and whether it is a hard deadline.
[ ] Ask whether this is a repeat of a part you have cast before, and for an old order number.
[ ] Say plainly that a person will check castability and give the price, and name who.
[ ] Give a real time for the next reply, such as the next working day.
[ ] Keep it to one short message with a numbered list of what you need.

What a strong first reply looks like

Picture a maintenance manager who sends a photo of a cracked pump housing. A strong first reply thanks them, says the part looks like a candidate for sand casting, and asks for the material, how many, any measurements and the date the plant needs it back. It ends by saying the foundry engineer will check it and answer by tomorrow.

That is five lines and it moves the job forward. The buyer now knows exactly what to send, and your engineer receives a complete enquiry instead of a vague one.

  • Ask for everything in one message, not five.
  • Name the person who will look at the part.
  • Do not quote a price or promise a delivery date in the first reply.

Mistakes to avoid

The most common mistake is replying with a long company brochure. Buyers asking about a part want questions about the part. The second is saying yes to castability before anyone has looked at the drawing, which can lead to an awkward correction later.

FAQ

Can the agent say whether we can cast a part from a photo?

It can say which process might suit and what you need to see. The final call on castability belongs to your engineer, who checks wall thickness, shape and alloy before anyone promises anything.

What if the customer has no drawing at all?

Ask for the broken part to be measured, or for a photo with a ruler beside it, and say you can arrange a sample drop-off. Many repair jobs start with just a worn original.

Should the first reply include our minimum order?

Yes, if you have one, since it saves time on both sides. State it as a plain fact and add that your engineer can talk through options for smaller runs.

More free tools for foundries and casting shops

Read the guide: Answer enquiry and casting status messages for your foundry.