Spaces

Hand-over rules: which site messages must go to a person

This checklist names the messages an AI agent should always hand to a person at a civil or heavy construction firm, such as damage, injury, easements and contract questions. It helps owners set the rules before a site message goes wrong.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

In civil work a wrong answer can be costly. A strike on a buried line, a claim for a cracked wall, a landowner asking what the easement really allows: these carry money, law and safety. An AI agent is a good helper with gate times and detour routes, and a poor one for anything that could end up in a claim.

Go through the rules below and mark the ones that fit your firm. Give the finished list to whoever sets up your agent, and name a person for each topic: the project engineer, the land agent, the safety officer, the estimator. A rule with no named owner does not work on a wet Friday afternoon.

Tick each one as you go. 0 of 10 done.

[ ] Any report of damage to a building, fence, driveway, drain or crop.
[ ] Any injury, near miss or unsafe situation on or near the works.
[ ] A reported strike, leak or exposed cable, pipe or main.
[ ] Questions about easements, access rights or what a landowner has signed.
[ ] Disputes about payment, invoices, retention or variations.
[ ] Requests for a bid, a price or a change to contract terms.
[ ] Questions from an inspector, regulator or council about permits or sign-off.
[ ] Lot buyers asking about contract terms, deposits or services to the boundary.
[ ] Anything from a journalist, a campaign group or a local councillor.
[ ] Anything the agent is unsure about, or when someone asks for a person.

Make the hand-over useful, not just fast

A person who picks up a chat should not have to ask the same questions again. A good note holds the job name, the place, who is writing, what they said and what the agent already told them. Our hand-over notes tool shows a shape you can copy.

Tell the person writing what happens next, in one line. For example: I have passed this to our site engineer, and she will call you before noon.

Settle these with your team first

Agree the answers before the first message arrives.

  • Who is on call for emergencies outside normal hours, and how are they reached?
  • Which messages must a person answer within an hour, and which within a day?
  • Who owns damage claims, land questions and press requests?

FAQ

Why can the agent not answer easement questions itself?

Because the wording of each agreement differs, and a wrong answer can hurt a landowner and the firm. Your land agent or lawyer is the right person to explain what was signed.

What should the agent say to someone reporting a leak or damaged line?

It should give your emergency number, tell them to stay clear, and hand the chat to a person straight away. It should not try to diagnose the problem or promise a repair time.

Can I add rules later?

Yes, and you probably will. Many owners add a rule after a near miss, and review the whole list after the first month of real messages.

More free tools for civil and heavy construction contractors

Read the guide: An AI agent for heavy and civil engineering construction messages.