Spaces

How many hours a week do site and neighbour messages take your firm?

This planner estimates the hours a week your civil or heavy construction firm spends answering messages. Enter how many arrive, how long each takes and how many days you answer.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Messages on a civil job arrive in small pieces. A haulier asks where to turn in. A neighbour asks when the road reopens. A buyer wants lot sizes. Each takes a few minutes, and each lands on someone who was doing something else, often a foreman, an engineer or an office manager.

Enter your own figures, or begin with the examples. Count a normal working day, not the quietest one. The result shows hours a week, hours a month and working days a month. It is a useful number to have before you decide who should handle chats, and when.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering15
Hours a month (4.3 weeks)65
Working days a month (8-hour days)8.1

This is an estimate worked out from the message counts and minutes you type in, so it is only as good as your own figures.

Reading your result

If the number surprises you, you are in good company. The time is scattered across breaks, tailgates and evenings, so nobody adds it up. Yet a foreman who loses an hour a day to messages is an hour short on supervising the crew.

Look at where the hours come from. Some messages need a person: damage, safety, land and money. Many do not, such as gate times, closure dates and induction steps. The second group is the one to write down as ready answers.

  • Count a full week of messages for a better average.
  • Include messages that arrive after the crew has left.
  • Note how many questions are the same ones repeated.

Who carries the load today

Write down which person answers which type of message right now. Often it is whoever picks up the phone first. If the answer is the site manager, the figure above is time taken from the most expensive hours of your week. A clear plan for who answers what can return that time without losing any care.

FAQ

How do I count messages if they come from many places?

Add up everything for one typical day: calls turned into messages, chats, texts and emails. A rough count over three days gives a fair average if you do not track them.

Should I include time spent on hand-over messages?

Yes, because those take real time too. They are the messages that need judgement, and they are where your team should still spend its time even after the routine questions are written down.

What does the result tell me to do?

It gives you a number to weigh against the cost of change. If the hours are small, a few ready answers may be enough. If they are large, it is worth planning who answers and when.

More free tools for civil and heavy construction contractors

Read the guide: An AI agent for heavy and civil engineering construction messages.