Spaces

How many hours a week do buyer messages take at your tooling shop?

This calculator turns your daily message count and the minutes each one takes into hours a week and days a month, so tooling and machine makers can see what messaging costs them.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Answering buyer messages rarely feels like a job of its own. It is a minute here, ten minutes there, between a shipment and a call from the shop floor. Added up, it can eat a large part of a counter person week, or an engineer time that should go to design.

Enter how many messages you get on a normal day, the average minutes each one takes, and how many days a week you answer. Include time spent finding a code, checking stock and asking an engineer. The numbers below show the weekly and monthly total.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering15
Hours a month (4.3 weeks)65
Working days a month (8-hour days)8.1

This is an estimate based on your own figures, so use an honest average rather than your best day.

Reading the result

If the answer surprises you, you are not alone. Most shop owners guess a few hours and find it is closer to a full working week for one person. Remember that a message to an engineer is more costly than one to the counter.

Look at what kind of messages fill the hours. Stock and code questions are quick to answer from written data. Design and cutting advice need a person and deserve protected time.

What to do with the number

Use the figure to decide where to act.

  • Split the hours between catalogue, quote and service messages.
  • Mark which questions repeat each week and could have a written answer.
  • Decide which messages must always reach an engineer.

FAQ

Should I include time spent on the phone?

Not in this figure. Count only messages in chat. If many buyers phone after a message, the real workload is higher, and you can add that time to the minutes figure.

How do I find my average minutes per message?

Time yourself over one day. Note when you start and finish each reply, including checking stock or asking a colleague. A rough average from ten messages is good enough.

Does a high number mean I need more staff?

Not always. It may mean the same questions are being answered by hand again and again. Written answers and an AI agent can free time before you hire anyone.

More free tools for machine tool, mold and cutting tool makers

Read the guide: Answer tooling and machine tool messages for metalworking suppliers.