Spaces

First-week checklist for a wood product shop starting with an AI agent

This checklist walks a wood product maker through the first week of letting an AI agent answer customer messages, from writing down standard sizes to reading the first chats. It suits small shops with busy benches.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

A shop floor does not stop for a software project, so the first week should be small. Pick one product line, write down what you already say on the phone, and let the agent answer only that. A door shop might start with standard exterior doors and leave windows for week three.

Work down the list in order and tick each step as it is done. If a step takes longer than an hour, shrink it. The aim is a real first week of real chats that you read yourself, not a perfect set of instructions on day one.

Tick each one as you go. 0 of 10 done.

[ ] Choose one product line to start with, such as stair parts or standard pallets.
[ ] Write down your standard sizes, species, profiles and finishes for that line.
[ ] Write the lead time for stock items and for made to order items.
[ ] List what the agent must ask for before a quote, such as width, height and photos.
[ ] Name the person who takes over, and their backup.
[ ] Write the rules for what the agent must never sign off, such as final sizes.
[ ] Set your showroom, yard and pickup hours, and your holiday dates.
[ ] Test the agent yourself with five real past enquiries.
[ ] Read every chat on days one, two and three.
[ ] Fix the sheet after each gap and note what you changed.

What a good first week looks like

By Friday you should have read most of the chats the agent handled, found a handful of gaps, and fixed them. Perhaps the agent did not know your baseboard comes in primed or unprimed, or it gave a pallet lead time that was a week out. Those are normal and quick to fix.

You should also have a clear feel for which chats reach a person and why. If every chat is handed over, the sheet is too thin. If none are, the limits may be too loose.

Things to leave for week two

Resist the urge to load everything at once.

  • Your second and third product lines.
  • Custom and one-off jobs with unusual materials.
  • Prefab building plans and manufactured home stages.
  • Detailed price lists that change often.

FAQ

How much time does the first week really take?

Expect a couple of hours to write the first sheet, then a short read of the chats each day. Most of the effort is writing down things you already tell customers by phone.

Which product line should we start with?

Start with the line that gets the most repeat questions and has the clearest answers, such as standard doors or common pallet sizes. Leave custom and engineered work until the basics are working.

What if the agent gets something wrong?

Note it, fix the sheet, and test it again. A wrong answer in week one is useful because it shows exactly which fact or limit was missing from your instructions.

More free tools for millwork, window, pallet and wood product makers

Read the guide: Answer door, window, pallet and millwork enquiries while the saws keep running.