Spaces

Busy-season checklist for asphalt, roofing and fuel messages

This checklist helps a petroleum products plant get its messaging ready for its busiest weeks, such as paving season, the roofing rush or a heating fuel peak. It covers slots, hours, stock and handover cover.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Demand in this industry comes in waves. Asphalt plants run flat out from spring to autumn. Roofing materials surge after storms and in summer. Heating and farm fuel peak with the cold or the harvest. In those weeks messages triple, and the people who answer them are loading trucks.

Use this list two weeks before your peak begins. It helps you decide what the agent can answer, what must wait for a person, and how to keep drivers and crews informed when the day goes wrong.

Tick each one as you go. 0 of 10 done.

[ ] Update loading and gate hours for the season, including early starts.
[ ] Write a plain queue rule for drivers arriving at once.
[ ] Refresh the list of mixes, grades and products on offer this season.
[ ] Set a clear rule for how far ahead loads must be requested.
[ ] Agree what happens when plant capacity is full.
[ ] Add weather and breakdown notices to your ready answers.
[ ] Check stock of pack sizes and pallets before you promise them.
[ ] Name extra handover cover for evenings and weekends.
[ ] Prepare a priority note for existing trade accounts.
[ ] Test the agent on five realistic peak-day messages.

Peak-day messages to rehearse

Try questions such as: Can you load 30 tonnes tomorrow at 6am? Are you open Sunday? Rain is forecast, will you still produce? Where do I queue? Each should get a short honest answer or a clear handover to dispatch.

If the agent cannot see your schedule, it should say it will pass the request on and give the dispatch desk everything in one note. That is far better than a guess.

After the rush

Peak season teaches you what your notes were missing. Do these as the pace slows.

  • Read the busiest week of chats and list the questions that repeated.
  • Add those answers to your written notes.
  • Thank the staff who covered the extra chats.

FAQ

When should I start preparing for the busy season?

Two to three weeks before it starts. That is long enough to update hours and written notes, test the agent, and set cover for evenings and weekends before the first rush of messages arrives.

Should the agent promise loads during the peak?

Only if it can read your live schedule. Otherwise it should collect the product, amount, site and time, and say a person will confirm the slot. A wrong promise at peak is expensive.

How do I tell crews about a delay without calling everyone?

Reply to the chats that are already open with a short honest delay note, and put the same line into your ready answers so new messages hear it too. Do not message people who have not written in.

More free tools for fuel, asphalt and lubricant makers

Read the guide: Handle trade and contractor messages for petroleum and coal products.