Spaces

How many hours a week do pipeline enquiries take your land team?

This planner estimates the hours a week your gas pipeline team spends answering enquiries from landowners, contractors and shippers. Enter how many arrive, how long each takes and how many days you answer.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Pipeline enquiries look small one by one. A quick question about a marker post. A request to check a drain plan against the route records. A shipper asking about an outage. But each one can involve checking drawings or asking a colleague, and those minutes add up across a long working week.

Enter your own figures, or begin with the examples. Use a typical day in digging season, not your quietest one. The result shows hours a week, a month and working days a month, which is a useful number before deciding who should answer chats.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering14
Hours a month (4.3 weeks)58
Working days a month (8-hour days)7.3

This is an estimate from the figures you enter, so use your real numbers for the best picture.

Reading your result

Many land teams are surprised by the figure, because the time is spread across short gaps between site visits and meetings. Land agents, engineers and administrators all lend minutes without counting them.

Think about where the time goes. Which questions are repeated? Which could be answered from a written note? Which need an engineer, and so should always go to a person?

  • Count messages across a full week for a better average.
  • Include messages that arrive out of hours.
  • Note how many are the same question repeated.

What to do with the number

A high figure is a reason to look at your routine, not a cause for alarm. Written answers cut minutes from each reply, and an AI agent can take the simple questions while your people keep the safety and land matters.

FAQ

How many enquiries should I count?

Count every message that needs an answer, from landowners, contractors, shippers and neighbours. Use an average across several days, and include the busy spring weeks if you can.

Should I include time spent on follow-up work?

Only the time spent answering the message itself. Site visits and drawing reviews are separate work, though you may want to note how often a chat leads to them.

What is a realistic number of minutes per message?

Simple questions take two or three minutes, while a crossing question that needs the route records can take fifteen or more. Use an honest average across both kinds.

More free tools for gas pipeline operators

Read the guide: Answer landowner and contractor messages along the pipeline route.