Spaces

Is your steel tube, wire or rolled section business ready for an AI agent?

This quiz asks eight yes or no questions to show whether a steel tube, wire or rolled section business has the written sizes, stock facts and hand-over people that an AI agent needs to answer buyers well.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

An AI agent can only answer what it has been told. A steel business with a clear size chart, a current stock list and a named person for price and engineering questions is ready. One that keeps all of that in the planner's head needs a little work first.

Answer each question for how your works runs today. Count the yes answers and read the band. If you score low, do not worry: the questions double as a to-do list, and most items can be done in a few days.

Do you have your standard sizes, wall thicknesses, gauges and lengths written down in one place?
Do you have a stock list that someone updates at least once a day?
Do you know which cuts, bundles and packing options you offer and their limits?
Do you have set lead times for standard runs?
Do you have a named person to take price, tolerance and suitability questions?
Do you know which questions must always go to an engineer or the shop floor lead?
Do you have set collection hours and rules for what drivers bring?
Are you comfortable reading a few chats each week to check the answers?

Answer all 8 to see your result. 0 so far.

What an agent really needs

Three things: facts, rules and people. Facts are your sizes, stock, cuts and lead times. Rules say what it may confirm and what it must hand over. People are the ones who take over, such as your estimator and shop floor lead.

If you can fill in those three, you are ready, even if the first version is small.

If you are not ready yet

Work through these in order.

  • Write the size chart this week.
  • Fix a time to update the stock list each day.
  • Name who takes over, and tell them.

FAQ

Do I need a perfect stock system first?

No. A simple list, updated daily by one person, is enough for a safe start. A live link to your system is better, but it is not required to begin with common questions.

Will an agent replace my counter staff?

No. It takes the repeated stock and size questions so the team can deal with the buyers who need a person, such as quotes, problems and special runs.

How long does it take to get ready?

Many steel businesses get ready in a week. Most of the time goes on writing the size chart and naming who takes hand-overs. The agent itself is quick once the facts exist.

More free tools for steel tube, wire and rolled section makers

Read the guide: Answer size and stock questions for your tube, wire and rolled steel business.