Spaces

Hand-over rules: which steel chats must go to a person

This checklist lists the steel buyer messages an AI agent should pass to a person, such as price, special tolerances, load questions and short deliveries. It helps owners set the rules before a wrong answer costs a job.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

An AI agent copes well with stock checks, standard sizes, cut options and collection hours. A steel business also gets messages where a wrong answer is expensive, like a tolerance you cannot hold or a buyer asking if a section will carry a load. Those must reach a person on your team quickly.

Go through each rule and decide whether it fits your works. Give the final list to whoever sets up your agent, and name the person on each shift who takes the call. A rule that nobody owns will fail on the Monday morning when twenty messages arrive at once.

Tick each one as you go. 0 of 10 done.

[ ] Any request for price, a discount or a matched rate.
[ ] Tolerances or finishes outside your standard range.
[ ] Questions on whether a section, tube or wire suits a load, spring or pressure use.
[ ] Requests for test certificates, traceability or heat numbers.
[ ] Short counts, damaged bundles and wrong material received.
[ ] Changes or cancellations to an order already on the line.
[ ] Special runs, new sizes and large tonnage enquiries.
[ ] Credit, payment terms and overdue account questions.
[ ] A buyer who is angry about a delay.
[ ] Anything the agent is not sure about.

Make the handover smooth

When a chat moves to a person, the buyer should not have to say it all again. A good note holds the company, the material, size, quantity, date and what has already been said. Our hand-over notes tool can help you write one.

Tell the buyer what happens next in one line, for example: I have passed this to our estimator, who will reply by the end of the day.

Settle these with your team first

Agree the answers before you switch anything on.

  • Who takes hand-overs on the shop floor, and who in the office?
  • How long may a buyer wait for a person to reply?
  • Who covers when the planner or estimator is away?

FAQ

Why not let the agent answer suitability questions?

Because the right answer depends on the load, the grade and the use, and a wrong one can hurt someone. Your engineer or shop lead can judge it, so the agent hands it over.

What if nobody can take the handover right away?

Tell the buyer honestly that the team is on the line and will reply as soon as they can. A short, true message is better than silence or a guess.

Can I change these rules later?

Yes. Review them after the first few weeks. Many owners add a rule after a close call and relax others once they see how well routine stock questions are handled.

More free tools for steel tube, wire and rolled section makers

Read the guide: Answer size and stock questions for your tube, wire and rolled steel business.