Spaces

A weekly review of operator and crew chats for contractors

This weekly checklist tells a drilling or well service owner what to check in the chats an AI agent handled during the week. It takes about twenty minutes and shows what to fix before the next programme.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Contractor work runs in weekly rhythms: planning on Monday, mobilisation midweek, paperwork on Friday. A short look back at the week's chats shows what operators and crews really ask, which answers fell short and which requests nearly slipped through.

You do not need to read every line. Skim, then use the points below to stay focused. Pick a fixed slot, perhaps right after the planning meeting, and use the same list each week so you can see the pattern change over time.

Tick each one as you go. 0 of 10 done.

[ ] Read every chat that was passed to a person.
[ ] Check how long each handover waited for a human reply.
[ ] Look for any safety or incident message and confirm it was acted on.
[ ] Note the three questions asked most often.
[ ] Check that no rate or unit commitment was given in chat.
[ ] Review messages from truckers and suppliers about the yard.
[ ] Look at applicant chats and the answers they received.
[ ] Spot any request that got no reply at all.
[ ] Update the weekly status note for regions, bids and yard hours.
[ ] Write down one thing to change before next week.

Turn the review into fixes

For each weak answer, ask whether it was a missing fact, an unclear sentence or a case that should always go to a person. A missing fact is added to the brief. An unclear sentence is rewritten. A sensitive case becomes a handover rule.

Keep a simple running list of changes with dates. After a month, read it back. You will see how much of the front desk work now runs smoothly and what still needs your people.

What to look for after a busy spell

After a programme release or a rig move, check these as well.

  • Did several people send near-identical requests that one note could answer?
  • Did crews ask about travel or camp details that were missing from the brief?
  • Did invoice follow-up messages reach accounts quickly?

FAQ

How long should the weekly review take?

About twenty minutes for most contractors. Start with handed-over chats and anything touching safety, then skim the rest. If it takes longer, the volume may justify a second reviewer.

Who should do the review?

Ideally the operations lead or the owner, since they know which answers sound right. A dispatcher can do a first pass and flag anything odd for the lead to read.

What if the review shows the agent got something wrong?

Correct the brief straight away and note the case. If the mistake was on a sensitive topic, add a handover rule so a person handles that kind of message from now on.

More free tools for drilling and well service contractors

Read the guide: Answer operators and crews for a drilling or mining support contractor.