Spaces

Do and do not rules for your tank and boiler agent

This guide gives plain do and do not rules for an AI agent speaking for a boiler, tank or container maker. It keeps the agent helpful on status and documents and silent on pressure, safety and price.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Your agent will speak in your name to people who are used to precise answers. Plant engineers notice a vague claim at once, and packagers notice a wrong lid size. A short rulebook keeps the agent useful where it can be exact, and quiet where only your engineer can answer.

Read each rule, change the ones that do not fit your works, and hand the final version to whoever sets up your agent. Keep a printed copy near the sales desk as well, so your people give the same answers the agent does.

Tick each one as you go. 0 of 10 done.

[ ] Do answer size, capacity and material range questions from your written product list.
[ ] Don't state a design pressure, temperature rating or code for any specific unit.
[ ] Do report job stages exactly as your tracker shows them.
[ ] Don't promise a delivery date unless a person has confirmed it.
[ ] Do pass shutdown and outage messages to a person straight away.
[ ] Don't give any price, discount or payment term.
[ ] Do collect drawing, quantity, date and use before handing a quote request over.
[ ] Don't comfort a buyer about a leaking or damaged vessel.
[ ] Do say clearly when a person is taking over and what happens next.
[ ] Don't claim a lining or closure suits a food, solvent or chemical product.

Why these rules fit your trade

In a normal shop an agent that over-answers is a small risk. In a pressure vessel works it is a real one. A buyer may quote your chat to an inspector, an insurer or their own manager, so the agent should say only what you would say in writing.

The rules also protect your engineers. If the agent keeps to facts and hands over everything else, your engineers spend their time on real judgement calls, not on correcting a chat.

Add your own rules

Every works has its own habits. Think about the times a buyer has been unhappy and write a rule for each.

  • Do use the same product names that appear on your quotes.
  • Don't use words your customers do not use, such as internal job codes.

FAQ

Can these rules be changed later?

Yes, and they should be. Review them after the first month, and again when you add a product, change a lead time or hear a complaint from a buyer.

What if a buyer insists on a price from the agent?

The agent explains that a person prepares every quote, collects the details needed and says when the buyer will hear back. It does not give a ballpark figure.

Do the rules apply to the human team too?

They are a good guide for everyone. Many works find the same rules help new sales staff avoid promising dates or ratings before the engineer has checked.

More free tools for boiler, tank and metal container makers

Read the guide: Answer plant and packaging buyer messages for your tank and boiler business.