Spaces

Hand-over notes for tank, boiler and container works

These hand-over notes show what an agent should write for your staff when it passes a chat on: who the buyer is, what they asked, what is urgent and what has been promised. They fit boiler, tank and container works.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

A handover goes wrong when the person picking it up has to scroll through twenty messages to find out what happened. A good note is four lines long and tells them everything they need before they reply. In a works with engineers on the shop floor, it also saves a phone call.

Fill in the team member who takes the handover and the usual deadline for a reply. The messages below set out the shape of a good note for four common situations. Give them to your agent as the pattern to follow every time it hands a chat over.

Technical question

For [staff]: a buyer asked a design or rating question for [business] that I cannot answer. Details and files are in the chat. I told them to expect a reply [reply].

Urgent shutdown

For [staff], urgent: a plant buyer mentioned a shutdown deadline and needs a date from [business]. Order or tag number is in the chat. I said a person would reply [reply].

Quote request

For [staff]: a new quote request for [business]. I collected the size, quantity, date needed and drawing, and noted anything missing. I told the buyer they would hear [reply].

Complaint or damage

For [staff]: an unhappy buyer reports a problem with an order from [business]. Photos and the order number are in the chat. I apologised and said someone would call [reply]. No fault accepted.

What every note should say

Think of the note as a message to a colleague who is walking into the room. They need to know who, what, how urgent, and what has already been said. If a note leaves any of those out, the colleague has to ask the buyer to repeat themselves, which is the worst thing a handover can do.

Add the exact time the buyer was promised. Your person then knows whether they have an hour or a day, and can plan around it.

A good note has these parts

Ask the agent to include them every time.

  • Who the buyer is, and their company.
  • The order, tag or quote reference.
  • What they asked, in one sentence.
  • How urgent, and why.
  • What the agent has already told them.

FAQ

How long should a hand-over note be?

Three to five short lines. If it is longer, people skim it. The full chat is always there for anyone who wants the detail, so the note only has to point the way.

Should the note include the buyer words?

Yes, for anything technical or emotional. A direct quote of what the engineer asked, or how upset the buyer sounded, is more useful than a summary written from memory.

What if the person does not read the note?

Make the urgent notes loud, such as a call or a message to their phone. In the weekly review, check how long each handover waited and who picked it up.

More free tools for boiler, tank and metal container makers

Read the guide: Answer plant and packaging buyer messages for your tank and boiler business.