Spaces

Message workload planner for boiler, tank and can makers

This planner turns your daily message count and the minutes each one takes into hours a week and days a month. It is for boiler, tank and container makers who suspect messages are eating the day.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

In a fabrication or can works, messages rarely arrive in a neat batch. A quote request, a where is my order, a request for a data book copy. Each takes a few minutes, and each pulls a sales person or engineer away from a drawing or a call. Added up, it is a surprise.

Enter how many messages you get on a typical working day, how long each takes you to deal with, and how many days a week you answer them. Include the time spent looking up a job or finding a document, since that is part of the answer.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering13
Hours a month (4.3 weeks)54
Working days a month (8-hour days)6.7

This is an estimate from your own figures, so use a typical week and not your best or worst one.

Reading your result

The big number is the hours a week your team spends on messages. Many owners are shocked to find it is closer to a part-time role than a few minutes between jobs. The monthly figure in working days shows what that time could buy if it went into quotes and engineering.

Remember that the cost is not only time. It is also the moment an engineer leaves the test bay to look up an order. Interruptions in a shop with welding and pressure testing are a safety and quality matter as well as a time one.

Where the minutes go

Look at which kinds of message take the most time in your own works.

  • Status questions, which need a look at the job tracker.
  • Document requests, which need a search and an email.
  • Quote requests, which need several rounds to get the details.
  • Repeat questions about sizes, lead times and minimum orders.

FAQ

Should I count messages that arrive by phone?

Count only written messages here. If phone calls cover the same questions, you can add them in separately to see the full cost of answering buyers.

What is a realistic time for each message?

Simple questions take two or three minutes, quotes and status checks often take eight to ten once you look things up. Time yourself over a day for a good figure.

Can an agent take all of this work?

No. It can take the plain questions and collect details, but pressure, safety, price and urgent messages stay with your people. The next calculator estimates the share it could take.

More free tools for boiler, tank and metal container makers

Read the guide: Answer plant and packaging buyer messages for your tank and boiler business.