Spaces

Message workload planner for engine, gearbox and drive makers

This planner turns your daily message count and the time each one takes into hours a week and a month. It is made for engine, gearbox and drive makers whose parts desk and engineers answer technical chats.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Technical messages take longer than they look. A single request may need a plate photo, a code check, a data sheet and a stock query. The time is spread between the parts desk, sales and an engineer, so nobody sees the total, and the owner often underestimates it.

Put in how many messages arrive on a normal day, how many minutes each one takes from first message to last, and how many days a week you receive them. The planner shows the hours a week and a month, which is a useful number to know.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering25
Hours a month (4.3 weeks)108
Working days a month (8-hour days)13

This is an estimate based on your own figures, so the more honest your inputs, the more useful the result.

Where the time really goes

Most of the minutes in a technical chat are spent finding things rather than writing. Searching an old catalogue for a superseded code, hunting a drawing in a shared folder or asking the workshop for stock all add up. Writing the reply is the short part.

That is why a good cross-reference list and a tidy folder of data sheets cut the total more than any typing speed could.

Use the number

Once you have the weekly hours, a few questions become easier.

  • Is a fair share of a person time going on messages already?
  • Which kind of message takes the longest?
  • Could ready answers and a clear process save a few hours?

FAQ

How do I count messages a day if I am not sure?

Look at the last five working days, count the new chats started each day and take the average. A rough count is enough, since the planner is only an estimate.

Should I count engineer time too?

Yes, if engineers spend time on chats, add it to the minutes for each message. The planner is most useful when it shows the total effort across everyone who answers.

Why does the result seem high?

Many owners are surprised. Short replies hide the time spent searching for codes and files. If the figure feels too high, test it by timing ten chats from start to finish.

More free tools for engine, gearbox and drive makers

Read the guide: Answer messages for engine, gearbox and drive component makers.