Spaces

The first-reply checklist for machine shop and fastener enquiries

This checklist shows what the first reply to a new enquiry should include, whether the buyer sends a drawing for a one-off part or asks about bolts in stock. It is made for machine shops and fastener makers.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

A buyer who sends a drawing is usually also asking two other shops. The first one to reply with a clear, useful question often gets the quote slot. In a job shop the first message tends to arrive half complete: a photo of a worn shaft, a file with no material, a date but no quantity.

Tick off each point as you read. Anything you cannot tick is a gap in how you, your office or your AI agent first answers. Pin it near the estimator desk, or read it out at the Monday meeting. The goal is one reply that gets the request complete, so nobody has to chase it later.

Tick each one as you go. 0 of 10 done.

[ ] Thank them and say you have the drawing or photo.
[ ] Ask for the material in one line if it is not stated.
[ ] Confirm the quantity, and whether it is a one-off or a repeat.
[ ] Ask for the date they need the parts by.
[ ] Ask which finish or heat treatment is needed, if any.
[ ] Say which file types you can read.
[ ] For a fastener, ask for size, grade, finish and pack quantity.
[ ] Say plainly if the part is outside your size or material range.
[ ] Tell them who will send the price and roughly when.
[ ] Keep it short and end with one clear next step.

What a strong first reply sounds like

Imagine your best estimator replying in a minute. For example: Thanks, I have the drawing. Is the material 316 stainless, and do you need 50 or more later? We can give you a price today. That reply takes eight seconds to read and gets two answers back.

It does not promise a price on a tight tolerance, and it does not guess a delivery date. Those belong to a person who has looked at the drawing and the machine schedule.

Slips that cost you the quote

These are the usual ones we see in shop chats.

  • Replying with a long list of every machine you own.
  • Asking for ten details at once, so the buyer goes quiet.
  • Quoting a lead time before anyone has looked at the job board.
  • Saying yes to a tolerance without the programmer seeing the drawing.

FAQ

How fast should the first reply to a drawing be?

Aim for the same working hour if you can. Even a short reply that confirms the drawing arrived and asks for the material keeps you in the running while the estimator is busy at the machine.

Should the first reply include a price?

Only for standard items you can price from a list, such as stocked fasteners. For machined parts, collect the full request first and let the estimator send a price after reading the drawing.

What if the buyer only sends a photo of a broken part?

Ask for the material if they know it, the main measurements and how many they need. A person may then ask them to send the old part in so you can measure it properly.

More free tools for machine shops and fastener makers

Read the guide: Answer machine shop and fastener messages while the spindles run.