Spaces

How many hours a week do installer messages take your team?

This planner estimates the hours a week your heating, cooling or refrigeration business spends answering messages. Enter how many arrive, how long each takes and how many days a week you take them.

Runs in your browser. Nothing you enter is sent anywhere or saved.

Before you start

Messages to an equipment maker rarely look like a job. They arrive between workshop tasks, during site visits and in the evening. But each one means finding a model, a manual or a part, and then writing it up clearly. In peak weather, that scattered time can take over an engineer's week.

Enter your own figures, or start with the examples. Count a typical day, not your quietest one. The result shows hours a week, hours a month and working days a month. It is a useful number to have before you decide who should read chats and when.

Every starting figure is an example. Change each one to your own.

Under your figures

Hours a week spent answering17
Hours a month (4.3 weeks)72
Working days a month (8-hour days)9

This is an estimate based on the figures you enter, so use your real numbers for the best picture.

Reading your result

If the number is bigger than you expected, look at who is doing the work. Often it is your most skilled engineers, who are answering questions about manuals and part numbers that a written note could cover. That is a costly use of their time.

Think about which messages need an engineer, and which only need a document or a distributor name.

  • Count messages for a whole week to get a fair average.
  • Include evenings and weekends if anyone reads chats then.
  • Note how many are the same questions repeated.

What to do with the number

A high figure is a reason to look at your routine, not to panic. Writing down common answers shortens each reply, and an AI agent can take the routine questions while your engineers keep the risky and technical ones.

FAQ

How do I count messages if they come from many places?

Pick a normal week and tally them by hand, or ask each team member to estimate. A rough count is enough. The aim is a fair picture, not an exact figure.

Should I count messages my engineers answer on site?

Yes, if they answer them. That time is part of the cost, even if it is done in small gaps. Include the minutes spent finding the information as well as typing the reply.

Does the result include phone calls?

No, only messages. If many chats turn into calls, add that time separately. A good reply early in the chat can often save a call, and that is worth noting.

More free tools for heating, cooling and refrigeration equipment makers

Read the guide: Answer contractor and owner messages for HVAC and refrigeration makers.